Written by Bev Fisher, Ian Fisher and Bruce Shalders
Here is one of Buller’s best kept secrets. Situated between Millerton and Denniston, the Westport Granity Coal Mines Ltd constructed an incline of 1.3 kilometres long up a cliff face to the coal deposits situated on the coastal escarpment. At 564 meters high, the incline consisted of four separate jigs and was worked on the gravity principle of loaded trucks pulling empties up the incline. The brainchild of Carl Roskvist, the mining operation delivered over 177,000 tons of high-quality coal during its formative operation between 1925 and 1935. The remaining coal reserve and later day opencast production is also covered
Retail: NZ $45.00 AU $65.00 RoW $78.00
Member: NZ $35.00 AU $55.00 RoW $68.00
Use our on-line order form under the Publications Tab to order your copy now.
